Skip to content
Back to Level 2
CMMC · Rev 2.13L2MA · Maintenance

MA.L2-3.7.6

Maintenance Personnel

Requirement

Supervise the maintenance activities of maintenance personnel without required access authorization.

Assessment objectives

An assessor checks each lettered objective separately. The letters in brackets elsewhere on this page, such as [a] or [b,c], refer to these.

Determine if:

  1. amaintenance personnel without required access authorization are supervised during maintenance activities.

From the CMMC Level 2 Assessment Guide v2.13 · publisher approved 2026-10-31.

How to implement

When someone without normal access authorization does maintenance on your systems (a copier technician, an HVAC or electrical contractor in the server room, a software vendor's engineer), an authorized employee supervises them for the whole visit. If they need a login, give them a temporary, limited one that expires, watch what they do physically and on screen, and revoke access when the job is done.

The minimum for a small organization · Expert CMMC's reading, not official text

Maintenance personnel without the access authorization the work requires (anyone not on your authorized maintenance list, such as a vendor's technician) work only under the supervision of an authorized employee [a]. Staying with them while they work and recording who supervised is the usual way; a visitor sign-in and a login that expires on its own are good additions.

Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.163 MA.L2-3.7.6

Required outcome: what the requirement or its objectives call for. Recommended way: one common way to get there. Going further: worth doing, more than this practice asks.

  1. 1
    Required outcomeProcessSupervise the maintenance activities of maintenance personnel without required access authorization.[a]

    You can tell it worked when every visit by maintenance personnel without the required access authorization names the authorized employee who supervised the whole of the maintenance activity, on site or in a remote session.

    SourceCMMC Assessment Guide Level 2 v2.13objective [a], p.163
    Quoted words
    • “maintenance personnel without required access authorization are supervised during maintenance activities”
  2. 2
    Recommended wayPolicyWrite the rule: maintenance personnel who are not on your authorized maintenance list are escorted and supervised by a named authorized employee for the whole maintenance activity, physically and, for remote sessions, on screen. List who may act as a supervisor.[a]
    Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.163 MA.L2-3.7.6
  3. 3
    Recommended wayProcessBefore the visit, schedule it through a ticket: who is coming, from which company, what systems they need, and who will supervise. Sign them in on the visitor log and badge them as a visitor.[a]
    Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.163 MA.L2-3.7.6
  4. 4
    Recommended wayTechnicalIf they need a login, create a temporary account that expires automatically (hours or days), scoped to only the systems involved, with no access to CUI shares. Never hand over an employee's or a shared admin credential.[a]
    Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.163 MA.L2-3.7.6
  5. 5
    Recommended wayProcessDuring the work, the supervisor stays with the technician, watches remote sessions live (attended mode), and removes or covers CUI paperwork and screens in the area. Where possible, move the device out of the CUI environment or sanitize it first.[a]
    Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.163 MA.L2-3.7.6
  6. 6
    Recommended wayProcessAfter the work, disable or delete the temporary account, confirm remote sessions closed, sign the visitor out and record the supervision in the ticket (supervisor, times, what was done).[a]
    Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.163 MA.L2-3.7.6

Evidence to collect

Artifacts that show the practice is implemented and operating. Tags show which assessment objectives each one supports.

A process you started recently is shown honestly by its dated procedure, the first record it produced and the date it began. No evidence row needs more history than the process has existed, and the review periods shown are suggestions unless a guide page or regulation is named beside them.

Maintenance personnel supervision procedure[a]

Maintenance visit tickets with supervisor named[a]

Also supports 1 other practice: keep it once

Visitor log entries for maintenance personnel[a]

Also supports 3 other practices: keep it once

See an example

The detail for 4 evidence items: how to produce each, how fresh it must be, what it must include and what it does not show.

Free with an account. Create a free account or sign in.

How assessors check

What an assessor examines, asks and tests: 3 notes.

Free with an account. Create a free account or sign in.

Tools and products

Named options a contractor can adopt, with an honest cost tier. The industry standard is listed even when it is expensive, alongside what is free and acceptable for a very small shop.

Paper visitor log and visitor badgesVisitor trackingFree
Envoy / Proxyclick (Eptura)Visitor managementPaid
Active Directory account expiration / Entra ID lifecycle workflowsTemporary accountsFree tier
Attended remote-support tools (ScreenConnect, Splashtop, BeyondTrust)Supervised remote sessionsPaid

17 dated vendor facts and notes on 4 products for this practice: what each assumes, what it does not cover and what stays yours.

Free with an account. Create a free account or sign in.

Editorial mentions, not endorsements. Pricing and tiers change; confirm with the vendor and check FedRAMP or GCC High availability where CUI is involved.

Common pitfalls

Platform notes

  • Microsoft 365 (GCC / GCC High)
  • Google Workspace
  • On-premises or MSP-managed

Notes for 3 platforms.

Free with an account. Create a free account or sign in.

Related practices: PE.L2-3.10.3, PE.L2-3.10.4, MA.L2-3.7.2, MA.L2-3.7.5, AC.L2-3.1.1

Editorial implementation guidance published November 20, 2026. It is not part of the official requirement and does not replace the assessment guide.

The NIST requirements this practice is built on, what NIST made of each in the newer edition, and the SP 800-53 controls behind them, each from an official NIST or DoD table. Open any one to read it and see every CMMC practice it supports.

NIST SP 800-171 Rev 2

3.7.6

SP 800-171 Rev 3

03.07.06

SP 800-53 Rev 4

MA-5

SP 800-53 Rev 5

MA-5DS
How these were reached
  • MA-5 · Maintenance Personnel
    • D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 MA-5 → 800-53 Rev 5 MA-5
    • S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL) · via 800-171 Rev 3 03.07.06 → 800-53 Rev 5 MA-5NIST: 03.07.06 also: 3.7.2 incorporated into

Rev 5 paths: D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison; S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL); C SP 800-172 (Feb 2021) Appendix C. NIST also names this Rev 3 requirement as the successor of other withdrawn requirements: open “How these were reached” under the Rev 5 controls for which, in NIST's words.

Where each link comes from (5 links from 5 official documents)

32 CFR Part 170 Office of the Federal Register / GPO

  • MA.L2-3.7.6 → 3.7.6“Level 2 security requirement”32 CFR 170.14(c)(1) numbering (REQ is the NIST SP 800-171 R2 requirement number) and 170.14(c)(3)

NIST SP 800-171 Rev 2 → Rev 3 change analysis NIST

  • 3.7.6 → 03.07.06“Significant Change”sheet "Change Analysis 800-171 R2-R3" row 70

NIST SP 800-171 Rev 2 NIST

  • 3.7.6 → MA-5“Appendix D mapping”p.86 Table D-7

NIST SP 800-53 Rev 4 → Rev 5 comparison NIST

  • MA-5 → MA-5“Changes control text Changes discussion”sheet "Rev4 Rev5 Compared" row 521

NIST SP 800-171 Rev 3 (OSCAL) NIST

  • 03.07.06 → MA-5“Source control”control 03.07.06 link rel=reference (MA-05)

Further discussion

Individuals without proper permissions must be supervised while conducting maintenance on organizational machines. Consider creating temporary accounts with short-term expiration periods rather than regular user accounts. Additionally, limit the permissions and access these accounts have to the most restrictive settings possible. Example One of your software providers has to come on-site to update the software on your company’s computers. You give the individual a temporary logon and password that expires in 12 hours and is limited to accessing only the computers necessary to complete the work [a]. This gives the technician access long enough to perform the update. You monitor the individual’s physical and network activity while the maintenance is taking place [a] and revoke access when the job is done. Potential Assessment Considerations • Are there processes for escorting and supervising maintenance personnel without required access authorization (e.g., vendor support personnel, short-term maintenance contractors) during system maintenance [a]?

Practice guide notes

Implementation guidance

Editorial examples to help you plan. Adapt them to your environment; the official requirement and objectives remain authoritative.

In plain language

Supervise maintenance personnel who lack the required access authorization.

Implementation example

Example from the source assessment guide (not a mandatory implementation): One of your software providers has to come on- site to update the software on your company’s computers. You give the individual a temporary logon and password that expires in 12 hours and is limited to accessing only the computers necessary to complete the work [a]. This gives the technician access long enough to perform the update. You monitor the individual’s physical and network activity while the maintenance is taking place [a] and revoke access when the job is done.

Evidence examples

Examples suggested by the source guide (not an exhaustive or mandatory checklist): System maintenance policy; procedures addressing maintenance personnel; service provider contracts; service- level agreements; list of authorized personnel; maintenance records; access control records; system security plan; other relevant documents or records

Common mistakes

Allowing an unapproved technician to work unobserved on an in-scope system.

Track this in a workspace

The compliance workspace tracks each objective, its evidence and the tasks to close gaps. It is open to invited contractors while in pilot: request access below.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Source: DoD CIO · https://dodcio.defense.gov/CMMC/