MA.L2-3.7.1
Perform Maintenance
Requirement
Assessment objectives
An assessor checks each lettered objective separately. The letters in brackets elsewhere on this page, such as [a] or [b,c], refer to these.
Determine if:
- asystem maintenance is performed.
From the CMMC Level 2 Assessment Guide v2.13 · publisher approved 2026-10-31.
How to implement
Keep the systems that handle CUI maintained on a defined schedule and record what was done: patches, firmware, hardware repairs, configuration changes and planned replacements. Assessors want to see a schedule that follows manufacturer recommendations or your own defined cadence, and records showing it actually happened. For a small shop this is usually a patch-management tool plus a simple maintenance log or ticket history.
The minimum for a small organization · Expert CMMC's reading, not official text
Maintain your systems [a]. The usual way covers devices and supporting equipment such as printers, copiers and UPS units, follows the manufacturer's recommendations or a schedule you define, decides who maintains what, applies updates and firmware, and records repairs and other maintenance. Automatic updates make the schedule easier to keep.
Required outcome: what the requirement or its objectives call for. Recommended way: one common way to get there. Going further: worth doing, more than this practice asks.
- 1Required outcomeProcessMaintain your systems.[a]SourceCMMC Assessment Guide Level 2 v2.13objective [a], p.152
Quoted words
- “system maintenance is performed”
- 2Recommended wayProcessFor objective [a], maintain every component, including supporting equipment such as printers, copiers and scanners, following the manufacturer's recommendations or a schedule you define, and record each maintenance action: the date, the asset, what was done and who did it. The guide's assessment consideration asks whether systems, devices and supporting systems are maintained per manufacturer recommendations or company-defined schedules (L2 guide p.153), and its discussion includes scanners, copiers and printers (L2 guide p.152).[a]
You can tell it worked when the maintenance records show the maintenance planned for each asset class done as the manufacturer recommends or on the schedule you set, and devices' update levels match that schedule.
Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.152 MA.L2-3.7.1andCMMC Assessment Guide Level 2 v2.13p.153 MA.L2-3.7.1 - 3Recommended wayPolicyWrite a maintenance policy or SSP section that names who performs maintenance (staff or MSP), what is in scope (workstations, servers, network gear, firewalls, printers, cloud tenant settings, building systems that support IT such as UPS units), and the cadence for each: for example operating-system and application patches monthly, critical patches within a defined window, firmware quarterly, UPS battery checks annually.[a]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.152 MA.L2-3.7.1
- 4Recommended wayTechnicalAutomate preventive maintenance where possible: Windows Update for Business or Intune update rings, an RMM or patch tool for third-party applications, automatic updates for macOS and mobile devices, and vendor auto-update or scheduled firmware checks for firewalls, switches and NAS units.[a]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.152 MA.L2-3.7.1
- 5Recommended wayProcessRecord every maintenance action, planned or unplanned: date, asset, what was done (patch, repair, part replacement, reconfiguration), who did it and the outcome. A help-desk ticket or a shared maintenance log is fine as long as it is consistent and searchable.[a]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.152 MA.L2-3.7.1
- 6Recommended wayProcessTrack hardware and software that is out of vendor support (end-of-life operating systems, firewalls without firmware updates) and either replace it, isolate it, or document the risk acceptance in your Plan of Action.[a]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.152 MA.L2-3.7.1
- 7Recommended wayProcessReview patch-compliance and maintenance records monthly; follow up on devices that missed updates and record the review.[a]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.152 MA.L2-3.7.1
Evidence to collect
Artifacts that show the practice is implemented and operating. Tags show which assessment objectives each one supports.
A process you started recently is shown honestly by its dated procedure, the first record it produced and the date it began. No evidence row needs more history than the process has existed, and the review periods shown are suggestions unless a guide page or regulation is named beside them.
Maintenance policy or SSP maintenance section[a]
Maintenance schedule[a]
Maintenance log or ticket history[a]
End-of-life asset list[a]
The detail for 5 evidence items: how to produce each, how fresh it must be, what it must include and what it does not show.
Free with an account. Create a free account or sign in.
How assessors check
What an assessor examines, asks and tests: 3 notes.
Free with an account. Create a free account or sign in.
Tools and products
Named options a contractor can adopt, with an honest cost tier. The industry standard is listed even when it is expensive, alongside what is free and acceptable for a very small shop.
13 dated vendor facts and notes on 5 products for this practice: what each assumes, what it does not cover and what stays yours.
Free with an account. Create a free account or sign in.
Editorial mentions, not endorsements. Pricing and tiers change; confirm with the vendor and check FedRAMP or GCC High availability where CUI is involved.
Common pitfalls
- Patching workstations but never updating firewall, switch, NAS or printer firmware.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.152 MA.L2-3.7.1
- Maintenance done by the MSP with no record delivered to you; require ticket exports or a monthly report in the contract.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.152 MA.L2-3.7.1
- Unplanned repairs (a replaced drive, a reimaged laptop) never logged because they were 'just a fix'.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.153 MA.L2-3.7.1
- No defined schedule, so there is nothing to show the assessor that maintenance follows a plan rather than happening when someone remembers.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.153 MA.L2-3.7.1
Platform notes
- Microsoft 365 (GCC / GCC High)
- Google Workspace
- On-premises or MSP-managed
Notes for 3 platforms.
Free with an account. Create a free account or sign in.
Related practices: MA.L2-3.7.2, SI.L2-3.14.1, CM.L2-3.4.3, RA.L2-3.11.3, SI.L1-b.1.xii
Editorial implementation guidance published November 20, 2026. It is not part of the official requirement and does not replace the assessment guide.
Crosswalk
Full crosswalkThe NIST requirements this practice is built on, what NIST made of each in the newer edition, and the SP 800-53 controls behind them, each from an official NIST or DoD table. Open any one to read it and see every CMMC practice it supports.
NIST SP 800-171 Rev 2
3.7.1SP 800-171 Rev 3
03.07.01withdrawn (NIST: Recategorized as NCO.)SP 800-53 Rev 5
MA-2DMA-3DMA-3(1)DMA-3(2)DHow these were reachedHide how these were reached
- MA-2 · Controlled Maintenance
- D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 MA-2 → 800-53 Rev 5 MA-2
- MA-3 · Maintenance Tools
- D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 MA-3 → 800-53 Rev 5 MA-3
- MA-3(1) · Maintenance Tools | Inspect Tools
- D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 MA-3 (1) → 800-53 Rev 5 MA-3(1)
- MA-3(2) · Maintenance Tools | Inspect Media
- D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 MA-3 (2) → 800-53 Rev 5 MA-3(2)
Rev 5 paths: D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison; S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL); C SP 800-172 (Feb 2021) Appendix C. NIST also names this Rev 3 requirement as the successor of other withdrawn requirements: open “How these were reached” under the Rev 5 controls for which, in NIST's words.
Where each link comes from (10 links from 4 official documents)
32 CFR Part 170 Office of the Federal Register / GPO
- MA.L2-3.7.1 → 3.7.1“Level 2 security requirement”32 CFR 170.14(c)(1) numbering (REQ is the NIST SP 800-171 R2 requirement number) and 170.14(c)(3)
NIST SP 800-53 Rev 4 → Rev 5 comparison NIST
- MA-2 → MA-2“Adds parameter Changes control text Changes discussion”sheet "Rev4 Rev5 Compared" row 503
- MA-3 → MA-3“Adds parameter Adds control text Changes discussion”sheet "Rev4 Rev5 Compared" row 506
- MA-3 (1) → MA-3(1)“More than editorial or administrative change? N”sheet "Rev4 Rev5 Compared" row 507
- MA-3 (2) → MA-3(2)“More than editorial or administrative change? N”sheet "Rev4 Rev5 Compared" row 508
Trace notes
Notes marked NIST state what the owners' own files say. Notes marked Expert CMMC note are our reading of the links, not official guidance. Neither is a crosswalk link.
About SP 800-171 Rev 2 3.7.1
Expert CMMC note3.7.1 ↔ MA-3 (SP 800-53 Rev 4)
NIST SP 800-171 Rev 2 Appendix D maps basic requirements 3.7.1 and 3.7.2 jointly to MA-2, MA-3, MA-3(1), MA-3(2). MA-3 mainly supports 3.7.2, not 3.7.1 specifically.
Relies on: NIST SP 800-171 Rev 2, p.86, Appendix D, Table D-7
Expert CMMC note3.7.1 ↔ MA-3 (1) (SP 800-53 Rev 4)
NIST SP 800-171 Rev 2 Appendix D maps basic requirements 3.7.1 and 3.7.2 jointly to MA-2, MA-3, MA-3(1), MA-3(2). MA-3(1) mainly supports 3.7.2, not 3.7.1 specifically.
Relies on: NIST SP 800-171 Rev 2, p.86, Appendix D, Table D-7
Expert CMMC note3.7.1 ↔ MA-3 (2) (SP 800-53 Rev 4)
NIST SP 800-171 Rev 2 Appendix D maps basic requirements 3.7.1 and 3.7.2 jointly to MA-2, MA-3, MA-3(1), MA-3(2). MA-3(2) mainly supports 3.7.2, not 3.7.1 specifically.
Relies on: NIST SP 800-171 Rev 2, p.86, Appendix D, Table D-7
Further discussion
Practice guide notes
Implementation guidance
Editorial examples to help you plan. Adapt them to your environment; the official requirement and objectives remain authoritative.
In plain language
Perform maintenance on organizational systems.
Implementation example
Example from the source assessment guide (not a mandatory implementation): You are responsible for maintenance activities on your company ’s machines. This includes regular planned maintenance, unscheduled maintenance, reconfigurations when requ ired, and damage repairs [a]. You know that failing to conduct maintenance activities can impact system security and availability, so you ensure that maintenance is regularly performed. You track all maintenance performed to assist with troubleshooting later if needed.
Evidence examples
Examples suggested by the source guide (not an exhaustive or mandatory checklist): System maintenance policy; procedures addressing controlled system maintenance; maintenance records; manufacturer or vendor maintenance specifications; equipment sanitiz ation records; media sanitization records; system security plan; other relevant documents or records
Common mistakes
Waiting for systems to fail rather than following the defined maintenance process.
Track this in a workspace
The compliance workspace tracks each objective, its evidence and the tasks to close gaps. It is open to invited contractors while in pilot: request access below.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.