AU.L2-3.3.4
Audit Failure Alerting
Requirement
Assessment objectives
An assessor checks each lettered objective separately. The letters in brackets elsewhere on this page, such as [a] or [b,c], refer to these.
Determine if:
- apersonnel or roles to be alerted in the event of an audit logging process failure are identified;
- btypes of audit logging process failures for which alert will be generated are defined; and
- cidentified personnel or roles are alerted in the event of an audit logging process failure.
From the CMMC Level 2 Assessment Guide v2.13 · publisher approved 2026-10-31.
How to implement
If logging stops, someone responsible has to find out quickly, because nothing will be recorded until it is fixed and an attacker may have stopped it on purpose. Name who gets alerted, list the failures that trigger an alert (a source going silent, an agent stopped, a log full or cleared, the central log store failing), and set up and test those alerts.
The minimum for a small organization · Expert CMMC's reading, not official text
Name who is told when logging stops working [a], decide which failures raise an alert [b], and make sure the alert reaches them [c]. An alert when a log source goes quiet or a logging agent stops, sent to those people from whatever collects or watches your logs, is the usual way, and stopping a source on purpose shows the alert arrives.
Required outcome: what the requirement or its objectives call for. Recommended way: one common way to get there. Going further: worth doing, more than this practice asks.
- 1Required outcomePolicyWrite down the personnel or roles to be alerted when an audit logging process fails, and the types of audit logging process failure that raise an alert.[a][b]SourceCMMC Assessment Guide Level 2 v2.13objectives [a] and [b], p.87
Quoted words
- “personnel or roles to be alerted in the event of an audit logging process failure are identified”
- “types of audit logging process failures for which alert will be generated are defined”
- 2Required outcomeTechnicalConfigure the alerts so each defined logging failure reaches the named people or roles.[c]
You can tell it worked when stopping a log agent or source in a test produces an alert to the named people or roles.
SourceCMMC Assessment Guide Level 2 v2.13objective [c], p.87Quoted words
- “identified personnel or roles are alerted in the event of an audit logging process failure”
- 3Recommended wayPolicyName the people or roles alerted on a logging failure (for example the IT lead and the MSP or SOC on-call) with their contact method, and a backup contact. Record this in the audit procedure and the incident response contact list.[a]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.87 AU.L2-3.3.4
- 4Recommended wayPolicyDefine the failure types that generate an alert: a log source sends nothing for a set period (for example 4 to 24 hours depending on the source), a logging agent or the Windows Event Log service stops, the security log is cleared (event 1102) or full (event 1104), audit policy is changed (event 4719), the SIEM or log server runs out of storage or hits an ingestion cap, and log forwarding or a cloud export fails.[b]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.87 AU.L2-3.3.4
- 5Recommended wayTechnicalConfigure the alerts: 'no data received' or source-health rules in the SIEM, agent-offline alerts in Wazuh, the EDR or the RMM tool, storage and quota alerts on the log server, and email or SMS delivery to the named roles. For a very small shop, an RMM service monitor plus a heartbeat check on the log server is acceptable.[c]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.87 AU.L2-3.3.4
- 6Recommended wayProcessTest at least quarterly and after changes: stop a log agent or disconnect a test source, confirm the alert reaches the named people within the expected time, and record the test and the response.[c]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.87 AU.L2-3.3.4
- 7Recommended wayProcessTreat a logging failure as a possible security event: record each real alert, the cause and the fix, and consider whether an adversary could have caused it.[a][c]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.87 AU.L2-3.3.4
Evidence to collect
Artifacts that show the practice is implemented and operating. Tags show which assessment objectives each one supports.
A process you started recently is shown honestly by its dated procedure, the first record it produced and the date it began. No evidence row needs more history than the process has existed, and the review periods shown are suggestions unless a guide page or regulation is named beside them.
The detail for 4 evidence items: how to produce each, how fresh it must be, what it must include and what it does not show.
Free with an account. Create a free account or sign in.
How assessors check
What an assessor examines, asks and tests: 3 notes.
Free with an account. Create a free account or sign in.
Tools and products
Named options a contractor can adopt, with an honest cost tier. The industry standard is listed even when it is expensive, alongside what is free and acceptable for a very small shop.
3 dated vendor facts and notes on 4 products for this practice: what each assumes, what it does not cover and what stays yours.
Free with an account. Create a free account or sign in.
Editorial mentions, not endorsements. Pricing and tiers change; confirm with the vendor and check FedRAMP or GCC High availability where CUI is involved.
Common pitfalls
- Alerts sent to a shared mailbox nobody reads, or to a former employee.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.87 AU.L2-3.3.4
- Only the SIEM server is monitored; individual sources can go silent for weeks unnoticed.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.87 AU.L2-3.3.4
- Never testing the alert, so the first time anyone learns it is broken is during an investigation.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.87 AU.L2-3.3.4
- Free SIEM tiers that stop ingesting at a cap without telling anyone.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.87 AU.L2-3.3.4
Platform notes
- Microsoft 365 (GCC / GCC High)
- Google Workspace
- On-premises or MSP-managed
Notes for 3 platforms.
Free with an account. Create a free account or sign in.
Related practices: AU.L2-3.3.1, AU.L2-3.3.8, IR.L2-3.6.1, SI.L2-3.14.6
Editorial implementation guidance published November 20, 2026. It is not part of the official requirement and does not replace the assessment guide.
Crosswalk
Full crosswalkThe NIST requirements this practice is built on, what NIST made of each in the newer edition, and the SP 800-53 controls behind them, each from an official NIST or DoD table. Open any one to read it and see every CMMC practice it supports.
NIST SP 800-171 Rev 2
3.3.4SP 800-171 Rev 3
03.03.04SP 800-53 Rev 4
AU-5SP 800-53 Rev 5
AU-5DSHow these were reachedHide how these were reached
- AU-5 · Response to Audit Logging Process Failures
- D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 AU-5 → 800-53 Rev 5 AU-5
- S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL) · via 800-171 Rev 3 03.03.04 → 800-53 Rev 5 AU-5
Rev 5 paths: D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison; S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL); C SP 800-172 (Feb 2021) Appendix C. NIST also names this Rev 3 requirement as the successor of other withdrawn requirements: open “How these were reached” under the Rev 5 controls for which, in NIST's words.
Where each link comes from (5 links from 5 official documents)
32 CFR Part 170 Office of the Federal Register / GPO
- AU.L2-3.3.4 → 3.3.4“Level 2 security requirement”32 CFR 170.14(c)(1) numbering (REQ is the NIST SP 800-171 R2 requirement number) and 170.14(c)(3)
Further discussion
Practice guide notes
Implementation guidance
Editorial examples to help you plan. Adapt them to your environment; the official requirement and objectives remain authoritative.
In plain language
Alert responsible personnel when the audit-logging process fails.
Implementation example
Example from the source assessment guide (not a mandatory implementation): You are in charge of IT operations for a company that processes CUI , and y our responsibilities include managing the audit logging process . You configure your systems to send you an email in the event of an audit log failure. One day, you receive one of these alerts. You connect to the system, restart logging, and determine why the logging stopped [a,b,c].
Evidence examples
Examples suggested by the source guide (not an exhaustive or mandatory checklist): Audit and accountability policy; procedures addressing response to audit logging processing failures; system design documentation; system security plan; system configuration settings and associated documentation; list of personnel to be notified in case of an audit logging processing failure; system incident reports; system audit logs and records; other relevant documents or records
Common mistakes
Discovering logging failures only during an incident investigation.
Track this in a workspace
The compliance workspace tracks each objective, its evidence and the tasks to close gaps. It is open to invited contractors while in pilot: request access below.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Source: DoD CIO · https://dodcio.defense.gov/CMMC/