Skip to content
Back to Level 2
CMMC · Rev 2.13L2AU · Audit & Accountability

AU.L2-3.3.3

Event Review

Requirement

Review and update logged events.

Assessment objectives

An assessor checks each lettered objective separately. The letters in brackets elsewhere on this page, such as [a] or [b,c], refer to these.

Determine if:

  1. aa process for determining when to review logged events is defined;
  2. bevent types being logged are reviewed in accordance with the defined review process; and
  3. cevent types being logged are updated based on the review.

From the CMMC Level 2 Assessment Guide v2.13 · publisher approved 2026-10-31.

How to implement

This practice is about the list of events you log, not about reading the logs. Decide when you will review that list (for example annually, after an incident, after a major system change or a new threat advisory), review it against current guidance and your own experience, and update the logging configuration when the review finds gaps.

The minimum for a small organization · Expert CMMC's reading, not official text

Decide when you review the list of events you log [a], review it then [b], and update the list from what you find [c]. The guide looks for a written process that says when the list is reviewed (a set interval, after incidents, after major system changes) and what the review considers (threats, retention capacity, new system components), and a short record of each review.

Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.85 AU.L2-3.3.3

Required outcome: what the requirement or its objectives call for. Recommended way: one common way to get there. Going further: worth doing, more than this practice asks.

  1. 1
    Required outcomePolicyWrite down when the list of logged event types is reviewed (for example at a set interval, after incidents and after major system changes) and what the review considers.[a]
    SourceCMMC Assessment Guide Level 2 v2.13objective [a], p.85
    Quoted words
    • “a process for determining when to review logged events is defined”
  2. 2
    Required outcomeProcessReview the logged event types as the defined process says (when it calls for a review, and against what it says to consider), and update the event types logged, in the list and in the logging configuration, based on the review.[b][c]

    You can tell it worked when a dated review record matches a trigger the process names, and each change the review decided appears in the logging standard's revision history and on the systems.

    SourceCMMC Assessment Guide Level 2 v2.13objectives [b] and [c], p.85
    Quoted words
    • “event types being logged are reviewed in accordance with the defined review process”
    • “event types being logged are updated based on the review”
  3. 3
    Recommended wayPolicyWrite the review trigger into the audit procedure: a scheduled review at least annually, plus a review after any security incident, a new system or major change entering the CUI boundary, or a relevant CISA or vendor advisory. Name who performs and approves the review.[a]
    Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.85 AU.L2-3.3.3
  4. 4
    Recommended wayProcessPerform the review against the current logging standard: compare it with vendor recommendations, the CIS Benchmark audit sections, the CISA and partner 'Best Practices for Event Logging and Threat Detection' guidance and MITRE ATT&CK data sources; check whether incidents or investigations were hampered by missing events; check storage use and noisy event types that could be reduced.[b]
    Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.85 AU.L2-3.3.3
  5. 5
    Recommended wayProcessUpdate the logging standard and the configuration (Group Policy or Intune audit settings, SIEM data connectors, firewall log settings) with what the review found, through the normal change process, and note the version and date on the standard.[c]
    Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.85 AU.L2-3.3.3
  6. 6
    Recommended wayProcessKeep a short review record each time: date, reviewer, trigger, what was considered, decisions, and the change ticket for any update.[a][b][c]
    Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.85 AU.L2-3.3.3

Evidence to collect

Artifacts that show the practice is implemented and operating. Tags show which assessment objectives each one supports.

A process you started recently is shown honestly by its dated procedure, the first record it produced and the date it began. No evidence row needs more history than the process has existed, and the review periods shown are suggestions unless a guide page or regulation is named beside them.

Event review procedure[a]

Event type review record[b]

Versioned logging standard and change ticket[c]

The detail for 3 evidence items: how to produce each, how fresh it must be, what it must include and what it does not show.

Free with an account. Create a free account or sign in.

How assessors check

What an assessor examines, asks and tests: 3 notes.

Free with an account. Create a free account or sign in.

Tools and products

Named options a contractor can adopt, with an honest cost tier. The industry standard is listed even when it is expensive, alongside what is free and acceptable for a very small shop.

CIS Benchmarks (audit policy sections)Configuration guidanceFree
MITRE ATT&CK data sourcesThreat-informed logging referenceFree
Microsoft SysmonEndpoint event loggingFree
SIEM content coverage features (Microsoft Sentinel, Splunk)Detection coverage mappingPaid

Notes on 4 products for this practice: why each matters here, what it assumes and what stays yours.

Free with an account. Create a free account or sign in.

Editorial mentions, not endorsements. Pricing and tiers change; confirm with the vendor and check FedRAMP or GCC High availability where CUI is involved.

Common pitfalls

  • Confusing this with log review (that is AU.L2-3.3.5 and AU.L2-3.3.6, L2 guide p.85); assessors want evidence about the event list itself.
    Quoted words
    • “This requirement is focused on the configuration of the auditing system, not the review of the audit records produced by the selected events. The review of the audit logs is covered under AU.L2-3.3.5 and AU.L2-3.3.6”
    • “list of organization-defined event types to be logged; reviewed and updated records of logged event types”
  • An event list that has not changed since it was written, with no record that it was ever reviewed.
    Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.85 AU.L2-3.3.3
  • Adding a new system (a new firewall, a cloud app) to the CUI boundary without adding its logs.
    Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.86 AU.L2-3.3.3

Platform notes

  • Microsoft 365 (GCC / GCC High)
  • Google Workspace
  • On-premises or MSP-managed

Notes for 3 platforms.

Free with an account. Create a free account or sign in.

Related practices: AU.L2-3.3.1, AU.L2-3.3.5, AU.L2-3.3.6, CM.L2-3.4.3, IR.L2-3.6.1

Editorial implementation guidance published November 19, 2026. It is not part of the official requirement and does not replace the assessment guide.

The NIST requirements this practice is built on, what NIST made of each in the newer edition, and the SP 800-53 controls behind them, each from an official NIST or DoD table. Open any one to read it and see every CMMC practice it supports.

NIST SP 800-171 Rev 2

3.3.3

SP 800-171 Rev 3

03.03.03

SP 800-53 Rev 4

AU-2 (3)

SP 800-53 Rev 5

AU-2DAU-11SAU-12S
How these were reached
  • AU-2 · Event Logging
    • D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 AU-2 (3) → 800-53 Rev 5 AU-2(3) → 800-53 Rev 5 AU-2
  • AU-11 · Audit Record Retention
    • S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL) · via 800-171 Rev 3 03.03.03 → 800-53 Rev 5 AU-11
  • AU-12 · Audit Record Generation
    • S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL) · via 800-171 Rev 3 03.03.03 → 800-53 Rev 5 AU-12

Rev 5 paths: D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison; S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL); C SP 800-172 (Feb 2021) Appendix C. NIST also names this Rev 3 requirement as the successor of other withdrawn requirements: open “How these were reached” under the Rev 5 controls for which, in NIST's words.

Where each link comes from (7 links from 6 official documents)

32 CFR Part 170 Office of the Federal Register / GPO

  • AU.L2-3.3.3 → 3.3.3“Level 2 security requirement”32 CFR 170.14(c)(1) numbering (REQ is the NIST SP 800-171 R2 requirement number) and 170.14(c)(3)

NIST SP 800-171 Rev 2 → Rev 3 change analysis NIST

  • 3.3.3 → 03.03.03“Significant Change”sheet "Change Analysis 800-171 R2-R3" row 29

NIST SP 800-171 Rev 2 NIST

NIST SP 800-53 Rev 4 → Rev 5 comparison NIST

NIST SP 800-53 Rev 5 (OSCAL, release 5.2.0) NIST

  • AU-2(3) → AU-2“Incorporated into”control AU-2(3) link rel=incorporated-into

NIST SP 800-171 Rev 3 (OSCAL) NIST

  • 03.03.03 → AU-11“Source control”control 03.03.03 link rel=reference (AU-11)
  • 03.03.03 → AU-12“Source control”control 03.03.03 link rel=reference (AU-12)

Trace notes

Notes marked NIST state what the owners' own files say. Notes marked Expert CMMC note are our reading of the links, not official guidance. Neither is a crosswalk link.

About this practice

About SP 800-171 Rev 2 3.3.3

Further discussion

This requirement is focused on the configuration of the auditing system, not the review of the audit records produced by the selected events. The review of the audit logs is covered under AU.L2-3.3.5 and AU.L2-3.3.6. Example You are in charge of IT operations for a company that processes CUI and are responsible for identifying and documenting which events are relevant to the security of your company’s systems. Your company has decided that this list of events should be updated annually or when new security threats or events have been identified, which may require additional events to be logged and reviewed [a]. The list of events you are capturing in your logs started as the list of recommended events given by the manufacturers of your operating systems and devices, but it has grown from experience. Your company experiences a security incident, and a forensics review shows the logs appear to have been deleted by a remote user. You notice that remote sessions are not currently being logged [b]. You update the list of events to include logging all VPN sessions [c]. Potential Assessment Considerations • Do documented processes include methods for determining when to review logged event types (i.e., regular frequency, after incidents, after major system changes) [a]? • Do documented processes include methods for reviewing event types being logged (i.e., based on specific threat, use case, retention capacity, current utilization, and/or newly added system component or functionality) [b]?

Practice guide notes

Implementation guidance

Editorial examples to help you plan. Adapt them to your environment; the official requirement and objectives remain authoritative.

In plain language

Review and update the events your systems log.

Implementation example

Example from the source assessment guide (not a mandatory implementation): You are in charge of IT operations for a company that processes CUI and are responsible for identifying and documenting which events are relevant to the security of your company’s systems. Your company has decided that this list of events should be updated annually or when new security threats or events have been identified, which may require additional events to be logged and reviewed [a]. The list of events you are capturing in your logs started as the list of recommended events given by the manufacturers of your operating systems and devices, but it has grown from experience. Your company experiences a security incident, and a forensics review shows the logs appear to have been deleted by a remote user . You notice that remote sessions are not currently being logged [b]. You update the list of events to include logging all VPN sessions [c].

Evidence examples

Examples suggested by the source guide (not an exhaustive or mandatory checklist): Audit and accountability policy; procedures addressing audit records and event types; system security plan; list of organization- defined event types to be logged; reviewed and updated records of logged event types; system audit logs and records; system incident reports; other relevant documents or records

Common mistakes

Keeping the original logging configuration indefinitely despite changing risks and systems.

Track this in a workspace

The compliance workspace tracks each objective, its evidence and the tasks to close gaps. It is open to invited contractors while in pilot: request access below.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Source: DoD CIO · https://dodcio.defense.gov/CMMC/