Skip to content
← 2.13 — Level 2

CM.L2-3.4.3

System Change Management

Source and approval

CMMC Assessment Guide — Level 2 · Revision 2.13

Publisher approved · Complete cited source edition 2026-10-31

Read the official guide

See CM.L2-3.4.3 in the reference catalog with its NIST cross-references

Official requirement

Track, review, approve or disapprove, and log changes to organizational systems.

Assessment objectives

a. changes to the system are tracked;

b. changes to the system are reviewed;

c. changes to the system are approved or disapproved; and

d. changes to the system are logged.

Implementation guidance

Editorial examples to help you plan. Adapt them to your environment; the official requirement and objectives remain authoritative.

In plain language

Track, review, approve, and log system changes.

Implementation example

Example from the source assessment guide (not a mandatory implementation): Once a month, the management and technical team leads join a change control board meeting. During this meeting, everyone reviews all proposed changes to the environment [b,c]. This includes changes to the physical and computing environments. The meeting ensures that relevant subject- matter experts review changes and propose alternatives where needed.

Evidence examples

Examples suggested by the source guide (not an exhaustive or mandatory checklist): Configuration management policy; procedures addressing system configuration change control; configuration management plan; system architecture and configuration documentation; system security plan; change control records; system audit logs and records; change control audit and review reports; agenda/minutes from configuration change control oversight meetings; other relevant documents or records

Common mistakes

Making emergency or routine changes without recording and reviewing them.

Apply this in your workspace →