CM.L2-3.4.3
System Change Management
Requirement
Assessment objectives
An assessor checks each lettered objective separately. The letters in brackets elsewhere on this page, such as [a] or [b,c], refer to these.
Determine if:
- achanges to the system are tracked;
- bchanges to the system are reviewed;
- cchanges to the system are approved or disapproved; and
- dchanges to the system are logged.
From the CMMC Level 2 Assessment Guide v2.13 · publisher approved 2026-10-31.
How to implement
Every change to the CUI environment (new software, firewall rules, cloud settings, hardware, even physical changes to the server room) should be requested, reviewed, approved or rejected, and logged. A small shop does not need a formal change board; a ticket for each change with an approver and a record of when it was done meets the intent, plus pre-approved 'standard' changes for routine work such as monthly patching.
The minimum for a small organization · Expert CMMC's reading, not official text
Every change to the systems in scope is tracked [a], reviewed [b], approved or turned down [c] (the guide's further discussion says before committing to production, L2 guide p.105), and logged when made [d]. A ticket or change log entry per change, with the reviewer, the decision and the date it was made, is the usual record.
Required outcome: what the requirement or its objectives call for. Recommended way: one common way to get there. Going further: worth doing, more than this practice asks.
- 1Required outcomeProcessTrack, review, approve or disapprove, and log every change to the system.[a][b][c][d]
You can tell it worked when each change in the sample has a record showing the review, an approval or disapproval dated before it was made, and when it was made.
SourceCMMC Assessment Guide Level 2 v2.13objectives [a], [b], [c] and [d], p.104Quoted words
- “changes to the system are tracked”
- “changes to the system are reviewed”
- “changes to the system are approved or disapproved”
- “changes to the system are logged”
- 2Recommended wayProcessFor objectives [a] to [d], keep one record per change that follows it from request to completion, shows who reviewed it, records the approval or disapproval and logs when it was made. The guide's assessment consideration gives a ticketing system as one way to document and track changes (L2 guide p.105).[a][b][c][d]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.105 CM.L2-3.4.3
- 3Recommended wayPolicyWrite a change management procedure: what counts as a change, change types (standard pre-approved, normal, emergency), who reviews and who approves each type, and how an urgent change is still reviewed and approved before it goes in (a short path to a named approver, or a pre-approved standard change). The guide grants no after-the-fact approval: "You must track, review, and approve configuration changes before committing to production" (L2 guide p.105).[a][b][c]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.104 CM.L2-3.4.3
- 4Recommended wayProcessTrack every change in one place, such as a ticketing system, a SharePoint or Google Sheets change log, or the MSP's ticket portal: requester, description, systems affected, planned date, rollback plan.[a]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.104 CM.L2-3.4.3
- 5Recommended wayProcessReview and decide: the technical reviewer and the business owner (or a monthly change meeting in larger shops) review each normal change, including its security impact (CM.L2-3.4.4), and record approval or disapproval with name and date. Keep disapproved changes on record too.[b][c]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.104 CM.L2-3.4.3
- 6Recommended wayProcessLog implementation: record who made the change, when, the result and any follow-up; update the baseline and inventory if affected.[d]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.104 CM.L2-3.4.3
- 7Recommended wayTechnicalCross-check: periodically compare system audit logs of configuration changes (Microsoft 365 audit, firewall config change logs, Intune audit logs) with approved tickets, and investigate changes that have no ticket.[a][d]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.104 CM.L2-3.4.3
Evidence to collect
Artifacts that show the practice is implemented and operating. Tags show which assessment objectives each one supports.
A process you started recently is shown honestly by its dated procedure, the first record it produced and the date it began. No evidence row needs more history than the process has existed, and the review periods shown are suggestions unless a guide page or regulation is named beside them.
The detail for 5 evidence items: how to produce each, how fresh it must be, what it must include and what it does not show.
Free with an account. Create a free account or sign in.
How assessors check
What an assessor examines, asks and tests: 3 notes.
Free with an account. Create a free account or sign in.
Tools and products
Named options a contractor can adopt, with an honest cost tier. The industry standard is listed even when it is expensive, alongside what is free and acceptable for a very small shop.
7 dated vendor facts and notes on 5 products for this practice: what each assumes, what it does not cover and what stays yours.
Free with an account. Create a free account or sign in.
Editorial mentions, not endorsements. Pricing and tiers change; confirm with the vendor and check FedRAMP or GCC High availability where CUI is involved.
Common pitfalls
- The MSP makes changes in its own tool with no approval from the company.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.104 CM.L2-3.4.3
- Treating urgent changes as exempt from approval. The guide has no emergency exception; a change made without approval is a deviation to record and review, not a change type.SourceCMMC Assessment Guide Level 2 v2.13p.105 CM.L2-3.4.3CMMC Assessment Guide Level 2 v2.13p.104 CM.L2-3.4.3
Quoted words
- “You must track, review, and approve configuration changes before committing to production”
- “unscheduled and unauthorized changes”
- Firewall rules and cloud settings changed directly in consoles with no ticket.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.104 CM.L2-3.4.3
- Only approved changes are recorded; assessors look for evidence that review could also reject a change.SourceCMMC Assessment Guide Level 2 v2.13objective [c], p.104
Quoted words
- “changes to the system are approved or disapproved”
Platform notes
- Microsoft 365 (GCC / GCC High)
- Google Workspace
- On-premises or MSP-managed
Notes for 3 platforms.
Free with an account. Create a free account or sign in.
Related practices: CM.L2-3.4.1, CM.L2-3.4.4, CM.L2-3.4.5, AU.L2-3.3.1
Editorial implementation guidance published November 20, 2026. It is not part of the official requirement and does not replace the assessment guide.
Crosswalk
Full crosswalkThe NIST requirements this practice is built on, what NIST made of each in the newer edition, and the SP 800-53 controls behind them, each from an official NIST or DoD table. Open any one to read it and see every CMMC practice it supports.
NIST SP 800-171 Rev 2
3.4.3SP 800-171 Rev 3
03.04.03SP 800-53 Rev 4
CM-3SP 800-53 Rev 5
CM-3DSHow these were reachedHide how these were reached
- CM-3 · Configuration Change Control
- D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 CM-3 → 800-53 Rev 5 CM-3
- S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL) · via 800-171 Rev 3 03.04.03 → 800-53 Rev 5 CM-3NIST: 03.04.03 also: SP 800-172 (Feb 2021) 3.4.1e addressed by (SP 800-171 Rev 3)
Rev 5 paths: D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison; S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL); C SP 800-172 (Feb 2021) Appendix C. NIST also names this Rev 3 requirement as the successor of other withdrawn requirements: open “How these were reached” under the Rev 5 controls for which, in NIST's words.
Where each link comes from (5 links from 5 official documents)
32 CFR Part 170 Office of the Federal Register / GPO
- CM.L2-3.4.3 → 3.4.3“Level 2 security requirement”32 CFR 170.14(c)(1) numbering (REQ is the NIST SP 800-171 R2 requirement number) and 170.14(c)(3)
Further discussion
Practice guide notes
Implementation guidance
Editorial examples to help you plan. Adapt them to your environment; the official requirement and objectives remain authoritative.
In plain language
Track, review, approve, and log system changes.
Implementation example
Example from the source assessment guide (not a mandatory implementation): Once a month, the management and technical team leads join a change control board meeting. During this meeting, everyone reviews all proposed changes to the environment [b,c]. This includes changes to the physical and computing environments. The meeting ensures that relevant subject- matter experts review changes and propose alternatives where needed.
Evidence examples
Examples suggested by the source guide (not an exhaustive or mandatory checklist): Configuration management policy; procedures addressing system configuration change control; configuration management plan; system architecture and configuration documentation; system security plan; change control records; system audit logs and records; change control audit and review reports; agenda/minutes from configuration change control oversight meetings; other relevant documents or records
Common mistakes
Making emergency or routine changes without recording and reviewing them.
Track this in a workspace
The compliance workspace tracks each objective, its evidence and the tasks to close gaps. It is open to invited contractors while in pilot: request access below.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Source: DoD CIO · https://dodcio.defense.gov/CMMC/