CA.L2-3.12.2
Operational Plan of Action
Requirement
Assessment objectives
An assessor checks each lettered objective separately. The letters in brackets elsewhere on this page, such as [a] or [b,c], refer to these.
Determine if:
- adeficiencies and vulnerabilities to be addressed by the plan of action are identified;
- ba plan of action is developed to correct identified deficiencies and reduce or eliminate identified vulnerabilities; and
- cthe plan of action is implemented to correct identified deficiencies and reduce or eliminate identified vulnerabilities.
From the CMMC Level 2 Assessment Guide v2.13 · publisher approved 2026-10-31.
How to implement
Keep one working list of the security gaps and vulnerabilities you have found, with a plan for fixing each: an owner, steps, milestones and target dates, and proof when it is done. This operational plan of action is different from the CMMC assessment POA&M in 32 CFR 170.21; it is your ongoing fix list, not subject to the 180-day closeout, and it should be kept up to date as work happens.
The minimum for a small organization · Expert CMMC's reading, not official text
List the deficiencies and vulnerabilities you need to fix [a], write a plan of action to correct them [b], usually with milestones, completion dates and an owner for each, and work the plan [c], usually keeping it current as the work is done. A spreadsheet or ticket project kept current, with a record of each fix, is the usual way; a check by someone other than the person who made the fix, as in the guide's example (p.212), is stronger.
Required outcome: what the requirement or its objectives call for. Recommended way: one common way to get there. Going further: worth doing, more than this practice asks.
- 1Required outcomeProcessIdentify the deficiencies and vulnerabilities the plan of action addresses, and write the plan of action to correct the deficiencies and reduce or eliminate the vulnerabilities.[a][b]SourceCMMC Assessment Guide Level 2 v2.13objectives [a] and [b], p.211
Quoted words
- “deficiencies and vulnerabilities to be addressed by the plan of action are identified”
- “a plan of action is developed to correct identified deficiencies and reduce or eliminate identified vulnerabilities”
- 2Recommended wayProcessFor objective [b], give each item in the plan milestones and completion dates. The guide's assessment consideration asks whether the action plan designates remediation dates and milestones for each item (L2 guide p.212).[a][b]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.212 CA.L2-3.12.2
- 3Required outcomeProcessWork the plan of action: carry out its steps to correct the deficiencies and reduce or eliminate the vulnerabilities.[c]SourceCMMC Assessment Guide Level 2 v2.13objective [c], p.211
Quoted words
- “the plan of action is implemented to correct identified deficiencies and reduce or eliminate identified vulnerabilities”
- 4Recommended wayProcessFor objective [c], update the milestones as the work is done and close each item once it is fixed. The guide's assessment consideration asks whether the action plan is maintained as remediation is performed (L2 guide p.212).[c]
You can tell it worked when open items show milestone updates, and closed items show a record that the fix was made (a rescan, a configuration record or a retest).
Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.212 CA.L2-3.12.2 - 5Recommended wayProcessFeed every source of deficiencies into the plan: control assessments (CA.L2-3.12.1), risk assessments (RA.L2-3.11.1), vulnerability scans that will not be fixed in the normal patch cycle (RA.L2-3.11.3), incidents, audit findings and continuous monitoring results.[a]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.211 CA.L2-3.12.2
- 6Recommended wayProcessFor each item record: the deficiency or vulnerability, affected requirement and systems, risk rating, accountable owner, specific remediation steps, milestones with responsible people, resources needed, interim compensating measures, and a target completion date that reflects severity and availability of a fix.[b]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.211 CA.L2-3.12.2
- 7Recommended wayProcessWork the plan: review it at a recurring meeting (monthly is typical), update milestone status and dates with reasons for any change, and escalate overdue high-risk items to leadership.[c]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.211 CA.L2-3.12.2
- 8Recommended wayProcessClose items only with verification: a rescan, a configuration screenshot or a retest by someone other than the person who made the fix, as the guide's example describes. Keep closed items for history.[c]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.211 CA.L2-3.12.2
- 9Recommended wayPolicyDocument in the SSP how the plan of action is maintained, who owns it, and how it relates to, but differs from, any CMMC assessment POA&M.[a][b]Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.211 CA.L2-3.12.2
Evidence to collect
Artifacts that show the practice is implemented and operating. Tags show which assessment objectives each one supports.
A process you started recently is shown honestly by its dated procedure, the first record it produced and the date it began. No evidence row needs more history than the process has existed, and the review periods shown are suggestions unless a guide page or regulation is named beside them.
The detail for 5 evidence items: how to produce each, how fresh it must be, what it must include and what it does not show.
Free with an account. Create a free account or sign in.
How assessors check
What an assessor examines, asks and tests: 3 notes.
Free with an account. Create a free account or sign in.
Tools and products
Named options a contractor can adopt, with an honest cost tier. The industry standard is listed even when it is expensive, alongside what is free and acceptable for a very small shop.
3 dated vendor facts and notes on 4 products for this practice: what each assumes, what it does not cover and what stays yours.
Free with an account. Create a free account or sign in.
Editorial mentions, not endorsements. Pricing and tiers change; confirm with the vendor and check FedRAMP or GCC High availability where CUI is involved.
Common pitfalls
- Confusing the operational plan of action with the CMMC assessment POA&M and keeping only the latter.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.212 CA.L2-3.12.2
- Items with no dates or milestones, which the assessment considerations look for (L2 guide p.212); an owner per item is the usual way to keep them moving.SourceCMMC Assessment Guide Level 2 v2.13p.212 CA.L2-3.12.2
Quoted words
- “Does the action plan designate remediation dates and milestones for each item”
- “ownership of who is accountable for ensuring the plan's performance”
- A plan written once for the SPRS submission and never updated.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.212 CA.L2-3.12.2
- Closing items on the say-so of the person who did the work, with no verification.Expert CMMC's adviceseeCMMC Assessment Guide Level 2 v2.13p.212 CA.L2-3.12.2
Platform notes
- Microsoft 365 (GCC / GCC High)
- Google Workspace
- On-premises or MSP-managed
Notes for 3 platforms.
Free with an account. Create a free account or sign in.
Related practices: CA.L2-3.12.1, CA.L2-3.12.3, RA.L2-3.11.1, RA.L2-3.11.3, CA.L2-3.12.4
Editorial implementation guidance published November 20, 2026. It is not part of the official requirement and does not replace the assessment guide.
Crosswalk
Full crosswalkThe NIST requirements this practice is built on, what NIST made of each in the newer edition, and the SP 800-53 controls behind them, each from an official NIST or DoD table. Open any one to read it and see every CMMC practice it supports.
NIST SP 800-171 Rev 2
3.12.2SP 800-171 Rev 3
03.12.02SP 800-53 Rev 5
CA-2DCA-5DSCA-7DPL-2DHow these were reachedHide how these were reached
- CA-2 · Control Assessments
- D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 CA-2 → 800-53 Rev 5 CA-2
- CA-5 · Plan of Action and Milestones
- D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 CA-5 → 800-53 Rev 5 CA-5
- S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL) · via 800-171 Rev 3 03.12.02 → 800-53 Rev 5 CA-5
- CA-7 · Continuous Monitoring
- D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 CA-7 → 800-53 Rev 5 CA-7
- PL-2 · System Security and Privacy Plans
- D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison · via 800-53 Rev 4 PL-2 → 800-53 Rev 5 PL-2
Rev 5 paths: D SP 800-171 Rev 2 Appendix D → SP 800-53 Rev 4 control → NIST's Rev 4 → Rev 5 comparison; S source control of the SP 800-171 Rev 3 or SP 800-172 Rev 3 requirement (NIST OSCAL); C SP 800-172 (Feb 2021) Appendix C. NIST also names this Rev 3 requirement as the successor of other withdrawn requirements: open “How these were reached” under the Rev 5 controls for which, in NIST's words.
Where each link comes from (11 links from 5 official documents)
32 CFR Part 170 Office of the Federal Register / GPO
- CA.L2-3.12.2 → 3.12.2“Level 2 security requirement”32 CFR 170.14(c)(1) numbering (REQ is the NIST SP 800-171 R2 requirement number) and 170.14(c)(3)
NIST SP 800-53 Rev 4 → Rev 5 comparison NIST
- CA-2 → CA-2“Changes title Adds control text Changes discussion Adds to Privacy Control Baseline (SP 800-53B)”sheet "Rev4 Rev5 Compared" row 237
- CA-5 → CA-5“Changes control text Adds to Privacy Control Baseline (SP 800-53B)”sheet "Rev4 Rev5 Compared" row 250
- CA-7 → CA-7“Changes control text Changes parameter Changes discussion Adds to Privacy Control Baseline (SP 800-53B)”sheet "Rev4 Rev5 Compared" row 255
- PL-2 → PL-2“Changes title Adds control text Changes control text Changes discussion Adds to Privacy Control Baseline (SP 800-53B)”sheet "Rev4 Rev5 Compared" row 622
Trace notes
Notes marked NIST state what the owners' own files say. Notes marked Expert CMMC note are our reading of the links, not official guidance. Neither is a crosswalk link.
About this practice
Expert CMMC note
Appendix D maps CA-2, CA-5, CA-7 and PL-2 jointly to 3.12.1-3.12.4. The direct source for 3.12.2 is CA-5; the others serve its siblings (CA-2 3.12.1, CA-5 3.12.2, CA-7 3.12.3, PL-2 3.12.4).
Relies on: NIST SP 800-171 Rev 2, p.92, Appendix D, Table D-12
About SP 800-171 Rev 2 3.12.2
Expert CMMC note3.12.2 ↔ CA-2 (SP 800-53 Rev 4)
NIST SP 800-171 Rev 2 Appendix D maps basic requirements 3.12.1–3.12.4 jointly to CA-2, CA-5, CA-7, PL-2. CA-2 mainly supports 3.12.1, not 3.12.2 specifically.
Relies on: NIST SP 800-171 Rev 2, p.92, Appendix D, Table D-12
Expert CMMC note3.12.2 ↔ CA-7 (SP 800-53 Rev 4)
NIST SP 800-171 Rev 2 Appendix D maps basic requirements 3.12.1–3.12.4 jointly to CA-2, CA-5, CA-7, PL-2. CA-7 mainly supports 3.12.3, not 3.12.2 specifically.
Relies on: NIST SP 800-171 Rev 2, p.92, Appendix D, Table D-12
Expert CMMC note3.12.2 ↔ PL-2 (SP 800-53 Rev 4)
NIST SP 800-171 Rev 2 Appendix D maps basic requirements 3.12.1–3.12.4 jointly to CA-2, CA-5, CA-7, PL-2. PL-2 mainly supports 3.12.4, not 3.12.2 specifically.
Relies on: NIST SP 800-171 Rev 2, p.92, Appendix D, Table D-12
Further discussion
Practice guide notes
Implementation guidance
Editorial examples to help you plan. Adapt them to your environment; the official requirement and objectives remain authoritative.
In plain language
Develop and implement plans to correct deficiencies and reduce vulnerabilities.
Implementation example
Example from the source assessment guide (not a mandatory implementation): As IT director, one of your duties is to develop action plans when you discover that your company is not meeting security requirements or when a security issue arises [b]. A recent vulnerability scan identified several items that need to be addressed so you develop a plan to fix them [b]. Your plan identifies the people responsible for fixing the issues, how to do it, and when the remediation will be completed [b]. You also define how to verify that the person responsible has fixed the vulnerability [b]. You document this in an operational plan of action that is updated as milestones are reached [b]. You have a separate resource review the modifications after they have been completed to ensure the plan has been implemented correctly [c].
Evidence examples
Examples suggested by the source guide (not an exhaustive or mandatory checklist): Security assessment and authorization policy; procedures addressing plan of action; system security plan; security assessment plan; security assessment report; security assessment evidence; plan of action; other relevant documents or records
Common mistakes
Recording a deficiency without an actionable correction plan or following it through.
Track this in a workspace
The compliance workspace tracks each objective, its evidence and the tasks to close gaps. It is open to invited contractors while in pilot: request access below.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Source: DoD CIO · https://dodcio.defense.gov/CMMC/