NIST SP 800-53 5
NIST SP 800-53 · Rev 5Reference standard · cross-referenced from CMMC Full text with a free accountSA · System and Services Acquisition
SA-18(2)
Inspection of Systems or Components
Withdrawn by NIST in NIST SP 800-53 Rev 5.
NIST: Moved to SR-10.
Related controls
Other reference-standard controls mapped to this one, each with the owner's words for the relationship and the official document that states it.
NIST 800-53 · Rev 4
- SA-18 (2)TAMPER RESISTANCE AND DETECTION | INSPECTION OF INFORMATION SYSTEMS, COMPONENTS, OR DEVICES
“Withdrawn” about SA-18 (2) · NIST SP 800-53 Rev 4 → Rev 5 comparison, sheet "Rev4 Rev5 Compared" row 873
NIST 800-53 · Rev 5
- SR-10Inspection of Systems or Components
“Moved to” about SA-18(2) · NIST SP 800-53 Rev 5 (OSCAL, release 5.2.0), control SA-18(2) link rel=moved-to
Source: NIST · https://csrc.nist.gov/pubs/sp/800/53/r5/final