NIST SP 800-53 5
NIST SP 800-53 · Rev 5Reference standard · cross-referenced from CMMC Full text with a free accountSA · System and Services Acquisition
SA-18(1)
Multiple Phases of System Development Life Cycle
Withdrawn by NIST in NIST SP 800-53 Rev 5.
NIST: Moved to SR-9(1).
Related controls
Other reference-standard controls mapped to this one, each with the owner's words for the relationship and the official document that states it.
NIST 800-53 · Rev 4
- SA-18 (1)TAMPER RESISTANCE AND DETECTION | MULTIPLE PHASES OF SDLC
“Withdrawn” about SA-18 (1) · NIST SP 800-53 Rev 4 → Rev 5 comparison, sheet "Rev4 Rev5 Compared" row 872
NIST 800-53 · Rev 5
- SR-9(1)Tamper Resistance and Detection | Multiple Stages of System Development Life Cycle
“Moved to” about SA-18(1) · NIST SP 800-53 Rev 5 (OSCAL, release 5.2.0), control SA-18(1) link rel=moved-to
Source: NIST · https://csrc.nist.gov/pubs/sp/800/53/r5/final