NIST SP 800-53 5
NIST SP 800-53 · Rev 5Reference standard · cross-referenced from CMMC Full text with a free accountPL · Planning
PL-2(1)
Concept of Operations
Withdrawn by NIST in NIST SP 800-53 Rev 5.
NIST: Incorporated into PL-7.
Related controls
Other reference-standard controls mapped to this one, each with the owner's words for the relationship and the official document that states it.
NIST 800-53 · Rev 4
- PL-2 (1)SYSTEM SECURITY PLAN | CONCEPT OF OPERATIONS
“More than editorial or administrative change? N” about PL-2 (1) · NIST SP 800-53 Rev 4 → Rev 5 comparison, sheet "Rev4 Rev5 Compared" row 623
NIST 800-53 · Rev 5
- PL-7Concept of Operations
“Incorporated into” about PL-2(1) · NIST SP 800-53 Rev 5 (OSCAL, release 5.2.0), control PL-2(1) link rel=incorporated-into
Source: NIST · https://csrc.nist.gov/pubs/sp/800/53/r5/final