NIST SP 800-53 5
NIST SP 800-53 · Rev 5Reference standard · cross-referenced from CMMC Full text with a free accountPE · Physical and Environmental Protection
PE-3(6)
Facility Penetration Testing
Withdrawn by NIST in NIST SP 800-53 Rev 5.
NIST: Incorporated into CA-8.
Related controls
Other reference-standard controls mapped to this one, each with the owner's words for the relationship and the official document that states it.
NIST 800-53 · Rev 4
- PE-3 (6)PHYSICAL ACCESS CONTROL | FACILITY PENETRATION TESTING
“Withdrawn” about PE-3 (6) · NIST SP 800-53 Rev 4 → Rev 5 comparison, sheet "Rev4 Rev5 Compared" row 573
NIST 800-53 · Rev 5
- CA-8Penetration Testing
“Incorporated into” about PE-3(6) · NIST SP 800-53 Rev 5 (OSCAL, release 5.2.0), control PE-3(6) link rel=incorporated-into
Source: NIST · https://csrc.nist.gov/pubs/sp/800/53/r5/final