NIST SP 800-53 5
NIST SP 800-53 · Rev 5Reference standard · cross-referenced from CMMC Full text with a free accountCP · Contingency Planning
CP-10(1)
Contingency Plan Testing
Withdrawn by NIST in NIST SP 800-53 Rev 5.
NIST: Incorporated into CP-4.
Related controls
Other reference-standard controls mapped to this one, each with the owner's words for the relationship and the official document that states it.
NIST 800-53 · Rev 4
- CP-10 (1)INFORMATION SYSTEM RECOVERY AND RECONSTITUTION | CONTINGENCY PLAN TESTING
“More than editorial or administrative change? N” about CP-10 (1) · NIST SP 800-53 Rev 4 → Rev 5 comparison, sheet "Rev4 Rev5 Compared" row 381
NIST 800-53 · Rev 5
- CP-4Contingency Plan Testing
“Incorporated into” about CP-10(1) · NIST SP 800-53 Rev 5 (OSCAL, release 5.2.0), control CP-10(1) link rel=incorporated-into
Source: NIST · https://csrc.nist.gov/pubs/sp/800/53/r5/final