NIST SP 800-172 3
NIST SP 800-172 · Rev 3Reference standard · cross-referenced from CMMC Full text with a free account
03.11.07E
Withdrawn by NIST in NIST SP 800-172 Rev 3.
NIST: Addressed by 03.17.01 (SP 800-171).
Related controls
Other reference-standard controls mapped to this one, each with the owner's words for the relationship and the official document that states it.
NIST 800-171 · Rev 3
- 03.17.01Supply Chain Risk Management Plan
“Addressed by (SP 800-171 Rev 3)” about 03.11.07E · NIST SP 800-172 Rev 3, p.56
NIST 800-172 · Rev FINAL
- 3.11.7e
“Withdrawn” about 3.11.7e · NIST SP 800-172 → Rev 3 change analysis, sheet "Change Analysis SP 800-172-R3" row 63
Source: NIST · https://csrc.nist.gov/pubs/sp/800/172/r3/final